Instance: sm2
- Contents:
- Information
- File downloads
- Solution files
- UPIT
- CPIT
- PCPSP
- References
Information:
- Description:
- Mine provided by Alexandra Newman
- Block model:
- 99014 blocks
- Blockfile columns detail:
- Blockvalue computation
- precomputed by provider
- Discount rate = 0.1
- Type of Constraints:
- C0 Capacity constraint (mine): Total extracted tonnage
- C1 Capacity constraint (process): Total processed tonnage
File downloads:
Download the
Minelib data format specification.
Solution files:
UPIT
- Download: sm2_upit.sol
- Objective value: 2,743,603,730
- Computed using Hochbaum's pseudoflow algorithm. [*]
CPIT
- Download: sm2_cpit_gmunoz120723.sol
- Objective value: 1,645,242,774 (LP GAP 0.2%)
- Provided by Gonzalo Muñoz, and obtained from the LP relaxation using
a modified TopoSort heuristic. [*]
- Download: sm2.LPcpit
- LP relaxation solution (not feasible)
- Objective value: 1,648,051,083
- Computed using a modified version of Bienstock & Zuckerberg
algorithm. [*]
PCPSP
- Download: sm2_pcpsp_gmunoz120723.sol
- Objective value: 1,650,439,213 (LP GAP 0.1%)
- Provided by Gonzalo Muñoz, and obtained from the LP relaxation using
a modified TopoSort heuristic.[*]
- Download: sm2.LPpcpsp
- LP relaxation solution (not feasible)
- Objective value: 1,652,394,327
- Computed using a modified version of Bienstock & Zuckerberg
algorithm.[*]
References:
- Daniel Bienstock,
Mark Zuckerberg (2010), Solving LP Relaxations of Large-Scale Precedence
Constrained Problems. IPCO 2010: 1-14
- Dorit
S. Hochbaum (2008), The Pseudoflow Algorithm: A New Algorithm for the
Maximum-Flow Problem. Operations Research 56(4): 992-1009
- Gonzalo Muñoz
(2012), Modelos de optimizacion lineal entera y aplicaciones a la
mineria. Master thesis, Dept. Mathematical Engineering, Universidad de
Chile.